Genoa Christian Academy

Design and Ministry Needs

The growing school and growing church shared space, and each needed more room to accommodate their growth. The school was designed to house Middle and High School students.

Highlights

The project not only contained classrooms and labs for students, but also a Music Arts room, a physical and graphic arts room, and a full kitchen. The commons include a small assembly platform and serves as a multipurpose space as the student cafeteria, a large group meeting space, and outdoor patio seating. In addition to the double basketball-size gym, the building houses locker rooms, a workout room, and school offices.

Results

The school opened with the facility with record enrollment, and the facility still gives them room to continue to grow.

 

 

Project Details

Genoa Christian Academy
Westerville, OH
www.genoachristianacademy.org

Project:
A new school facility to house 400 middle and high school students with a master Plan for additional growth

Square Feet:
65,758 square foot new school facility

Project Completed:
May 2024

For more information
please contact:

The McKnight Group
(614) 875-1689
(800) 625-6448
request@mcknightgroup.com

Case Study

When people ask me what we think of The McKnight Group, I tell them we built a multimillion-dollar sanctuary with them and then turned right around and built a multimillion-dollar school building with them.

Scott Lewald, Executive Pastor

CONTACT THE MCKNIGHT GROUP