church iconThroughout this series of posts, we’ve been offering advice and information to church leaders on whether to remodel or start fresh. For some churches, that decision is already made. The goal is simply to remodel the existing church building.

If that’s you, great. Just know that older facilities often hold surprises. Here’s what to be aware of before you start.

What’s Hiding Behind the Walls?

The condition of the existing structure is often the biggest unknown. Here are some hiccups that church leaders can run into when creating a remodeling church design.

Fire alarm systems. These are often out of date in older facilities. For a facelift, that may not matter. But if you’re rearranging space and need drawings and permits, local authorities may require a system that meets current standards.

Sprinklers. This is a frequent question we hear: “Do we have to sprinkler the building if we remodel?” Most of the time, no. If you are adding space or changing the use of a build it can be required. However, there are ways to limit the need for sprinkler system.

Restrooms. Older restrooms are often inadequate for handicap accessibility, and updating that can be an issue, if required.

HVAC. If your building is 50, 60, or 70 years old, regulations often mean that the HVAC units will need to be replaced with newer ones.

Electrical service. Often, it’s fine. But sometimes the panels are too old to use, and in a building approaching 100 years, the wiring may be inadequate.

Roof. Don’t make a space brand new under a failing roof. Handle roof issues first.

Insulation. We sometimes find minimal insulation, or none at all. Adding it may need to be part of the plan.

None of these are unusual. They’re just the things that people don’t anticipate.

Other Considerations

If you’ve purchased a building that wasn’t a church, you’ll face what’s called a “change of use.” Turning a car dealership, a school, or a movie theater into a church triggers an official zoning process. Your church design then needs to meet the building code requirements that come with that new use.

The Americans with Disabilities Act also matters when you remodel, and your scope determines how much. If you just want to change your toilet partitions and paint the walls, you may not need to meet full standards. But if you want to make your restrooms bigger, you’ll likely have to meet them.

Anticipating the Cost

Remodel cost generally falls into one of three levels:

A Facelift. This consists of new carpet, fresh paint, patched holes in the walls, maybe new ceiling tile. Nine times out of ten, there are no real structural issues involved. This really is closer to maintenance, and it’s the easiest kind of project to do.

Rearranging Spaces. Maybe your worship space platform has multiple levels, or walls close off a space that should feel open and flexible, and you want it all on one level. Once walls come out, you could be into structural and/or fire rated work. That must be permitted, and permits bring handicap accessibility and other code requirements into play.

Large Structural Changes. This is where the surprises can live. A roof that’s been bad for a while may have rotted the roof deck and affected the structure. We’ve also seen termite damage, rusting, flood damage, and mold. Issues like these are special: they need to be addressed, and many will require permits as well.

Knowing which level you’re dealing with helps you set realistic expectations for budget and timeline before you commit.

Learn More